This week, more detailed and calculated FEA analysis is conducted. I setup a word file. The link is https://drive.google.com/open?id=1xC-1DClN5L0nj40wbD66ZfUY0WL9ha3i
A few FEA are conducted in these two weeks. These FEA tests focused on the load arm reaction when applied real life situation. a 10 Kn load is added on the bottom of the load arm. The material I choose have the maximum yield strength 3.5*10^8 Pa. For the top structure, a load of 5Kn is added. the force is caused to the turning at maximum speed.
These two weeks, I did few FEA analysis on the current design. There are parts being purchased. At this moment. I'm heavily depend on Dan to publish his new design and ideas on building this bogie.